Chapter 197

Style: Romance Author: Wandering in the old cityWords: 2342Update Time: 24/02/20 12:14:19
After returning home, Zeng Yiming handed the bank card to Fang Lei. After all, she had given this card to him.

Fang Lei accepted it and scolded: "Silly boy, I told you that this is the New Year's money saved for you. You have many things to spend money on, so just keep it."

As she spoke, she walked to the kitchen. He saw that Zeng Yiming had drunk too much and was going to make him a bowl of hangover soup.

The latter thought that Jinsheng Company needed a large amount of advance capital for the second phase, and he put the card back in his pocket.

The next day, Zeng Yiming said goodbye to Fang Lei and returned to the capital of Shu with Xuan Jianye.

When I returned to the office, I saw that my dear fellow, he was not at work. There was not even anyone on duty in the office.

He shook his head helplessly and planned to go around several construction sites to check their work during the festival and send Xuan Jianye back to Xiaocheng County.

Xuan Jianye was not in a hurry. It was not yet his duty time, so there would be nothing wrong with him when he returned.

"I'm going back to tell you that I need to visit some people during the festival. Just find me a car."

Zeng Yiming thought for a moment and gave him the red flag.

He drove the 212 Jeep to the nearest construction site of Jinsheng Company.

The main body of the sales department has been completed and has entered the decoration stage.

It is said that the decoration plan was produced by Xiangjiang Master.

There is a saying that the works of masters just pay more attention to details than ordinary designers. For example, the processing of closing edges and closing edges is clearly marked in the construction drawings, which is currently unmatched by ordinary design units in the mainland.

The stone was all imported stone, but Hao Jingtai was so smart that he found the owner and asked them to provide suggestions for the design, and changed it into ceramic tiles of the same color, euphemistically calling it: practical.

"Mr. Zeng, this change will save at least forty-five percent of the material price."

Zeng Yiming nodded helplessly after hearing this. There was nothing wrong with him. After this change, his financial pressure would indeed be less.

"Well done, pay attention to the safety settings at the suspended parts and openings upstairs."

Suddenly he saw that the integrated panels were being dry-hanged on the outer wall. He was so brave to dry-hang them directly on the red bricks.

He called Hao Jingtai and asked him: "Why is it that the exterior wall is so directly hung? Have you done a water seepage test?"

Hao Jingtai didn't understand what he meant and asked: "The manufacturer has not given any guidance, and the design unit has not made clear the method. Shouldn't it be hung directly? I think the water-repellent nature of the integrated board is very good."

Zeng Yiming smiled bitterly and said: "General Engineer Hao, what if water seeps from the seams of the boards and penetrates the wall? It is better to ask the design unit to add the process of plastering the exterior walls and use waterproof mortar."

Hao Jingtai was stunned for a moment. He nodded suddenly and took him to look around again. He found no other problems before going to Zong Ping's side.

Prefabricated concrete socket pipes and brick inspection wells are all used for drainage.

It has not been banned at this stage, but it will be banned in two years to protect downstream domestic water.

The pipelines between the inspection wells need to be blocked and filled with water before backfilling, and the water level loss in the inspection wells must be observed and recorded to determine whether there are abnormalities and whether leakage has occurred.

Backfilling can only be done after confirming that there are no leaks in the pipe.

"Pay attention to the stone content in the backfill soil for this pipe so that it doesn't get crushed when it's backfilled."

Pipe backfilling is usually carried out manually and mechanically to loosely fill in layers to 50 centimeters above the top of the pipe. After layered compaction using a frog tamping machine, a ring knife test or a sand filling test is used to ensure that the self-inspection of the density is passed before proceeding. Notify the third-party laboratory that only after everyone's data is qualified can the upper mechanical backfilling be started, and after completion, a ring knife test or a sand filling test can be conducted.

Of course, if it is gravel, just use water tamping.

Starting from the roadbed, municipal roads must not only check the compactness, but also measure the deflection. If any test fails, it needs to be repeated.

After Zeng Yiming inspected the general leveling, he came to the second phase construction site. Earth is still being excavated here. It can be seen that the maintenance piles for the surrounding foundation pits have been completed, and the spraying protection work in the middle is still being implemented intensively.

"Pay attention to the drainage work after spraying the wall. Don't save the upper and lower drainage ditches, this is very important."

Although it is October and the local wet season has passed, drainage work is still done just in case.

Sun Yongjun thought for a while and nodded vigorously.

"No problem. We have embedded steel bars in the piles. When the time comes, the steel bars for the protective wall will be welded together and secure."

Zeng Yiming didn't say anything after hearing this, but still warned: "You must always keep safety in mind. You should arrange for a full-time security officer to be more vigilant. Don't be afraid that he will cause you trouble. Although there may be a lot of small troubles at the beginning, this is to avoid future troubles." big trouble."

Sun Yongjun pursed his lips, smiled and invited him to sit in the office next to him for a while.

"The earthwork for this project will have to be excavated for at least half a month. Do we need to do some replacement and filling under the foundation pit?"

Zeng Yiming didn't answer. He looked at Hao Jingtai next to him. The latter saw him looking at him and answered: "If the situation is not good, just dig it out and do whatever you want. I will communicate with Mr. Luo then." ."

After he finished speaking, he suddenly saw that Zhang Xin was not here, and added: "Miss Zhang can go and report to Mr. Zhang in advance."

Zeng Yiming nodded with satisfaction: "Yes, we don't deliberately create replacements. If there is a need to replace it, we will replace it. We must not save the welfare of workers on site. Don't save money for me."

Sun Yongjun thought for a while after hearing this, and suddenly he thought of a problem. He knew how to deal with the upper layer of earth, but he had no idea how to deal with the lower gravel.

Zeng Yiming was stunned for a moment. This was indeed a problem. He thought for a while and then said:

"It looks like it's not out yet. Don't worry, I'll go to a few other construction sites to see if it's needed. If there's no place to ask for it, I'll ask other companies if they need it."

At this moment, a middle-aged man walked in with a smile, took out Huazi and handed it around to everyone.

"Mr. Zeng is here. I was in the foundation pit just now, so I came late."

Zeng Yiming did not answer his words and looked at Sun Yongjun.

Sun Yongjun frowned and introduced without emotion: "This is Mr. Zhao, the owner of the earthmoving subcontractor."

Zeng Yiming nodded with him and said to him: "I don't care when you enter the site, but you can't fight at my construction site, and you can't cheat. Can Manager Cai set the unit price for excavation and fill for you?"

Zhao Changbiao blushed when he heard this, and he hurriedly explained: "Mr. Zeng is joking, I am also a serious businessman. Please rest assured that no one dares to make trouble in this project. When it comes to the unit price, your Manager Cai is really stingy. , 25% lower than the market price.”

As he spoke, he stared at Zeng Yiming's face, trying to detect some mood swings, but he was disappointed.

"Can you excavate the sand and gravel from the foundation pit and sell it to me? The price will be based on the market price."

After Zeng Yiming heard this and thought about it, it was not impossible to sell it to them directly. It was just that he was worried that they would manipulate the data, so he put two people in charge.

"You can discuss it in detail with Manager Sun and Chief Engineer Hao then."

Sun Yongjun smiled helplessly when he heard this, "This is a good job."

"Okay, I'll give you the data after the balance is done. It's also good to offset part of the project payment."

Zhao Changbiao saw that his goal had been achieved, so he confessed and left.

The construction office areas of the first and second phases of the site were merged together. He ran to the kitchen to have a look, and left with satisfaction after learning about the living conditions of the on-site management staff.