Zeng Yiming was in a good mood after taking care of the steel and cement. The only drawback now was that there was no cooperative manufacturer for the procurement of red bricks. He took advantage of the situation and obtained procurement contracts with many brick factories along the route.
Time flies, and in the blink of an eye, I received the winning bid notice for the Hengshan Resettlement Community from the Urban Construction Investment Company.
Zeng Yiming brought the reluctant Zhang Wen to the Urban Construction Investment Company to sign the contract, obtained the geological survey report, the general layout plan and the basic construction drawing, and copied an electronic version.
The project manager of the Urban Construction Investment Company, whose surname is Li, is Li Hongjun. He is about forty years old, tall and handsome, with a bit of a general belly.
"Mr. Zeng, you are young and promising. Can I take Mr. Zeng to see the scene?"
"Sorry, Mr. Li."
Approaching the Third Ring Road in the southwest, they passed a dead end road and continued walking south on a dirt road for two kilometers before getting out of the car.
It can be seen that the site has not been leveled yet. Although there is a simple fence, the weeds are not restrained and are growing happily.
"This is it, you have to get in as soon as possible."
"It's almost noon, Mr. Li, why don't we have a casual dinner together?"
Mr. Li walked forward without looking back: "We won't eat today. You hurry up and organize the entrance. I will go and meet with the director of this project later."
Seeing his businesslike look, Zeng Yiming rubbed his head.
"Okay, I'll take Mr. Li to the car."
As if by magic, he took out an envelope and put it on Mr. Li's car calmly.
"Mr. Li, I'm pressed for time today and didn't have time to buy souvenirs. I'll make up for it next time. Slow down on the road."
Mr. Li glanced at the envelope, smiled, and drove away.
Zeng Yiming returned to Zhang Wen, smiled and whispered in a low voice: "Remember you for your contribution."
He took out the general map and carefully checked the site, only to discover that there was a small river flowing through the middle of the plot.
Calling it a small river is a bit of an exaggeration. To be more precise, it should be a small stream. The width of the stream is less than three meters and the current is very fast.
"Go back and start making construction layout drawings, and try to get into the site tomorrow. I'll call Lao He and ask him to arrange for someone to come over tomorrow and start making temporary facilities."
Zhang Wen nodded when he heard this: "With this creek here, we can do a lot of things."
Of course Zeng Yiming knew what he wanted to say. The groundwater level was too high and precipitation measures were needed. Small bridges had to be built across the stream, and construction water could be extracted directly.
"Let the surveyors come over tomorrow morning and re-measure the original landform."
Zhang Wen raised his eyes and looked at the weeds after hearing this. The bastard actually had a light in his eyes, as if a crazy man had seen a beautiful woman. This made Zeng Yiming very surprised. He couldn't help but think: "What's so interesting about these weeds? Is this guy a plant fanatic?"
He reacted instantly. Was he trying to make a fuss about the original elevation of the landform?
He reminded: "We must do things with integrity and carefully study the earthwork balance after we return."
He doesn't want to see huge earthwork differences by then, and the vertical design drawings will definitely be released.
If the difference between the two is too large, it will cause unnecessary trouble.
Back in the office, Zeng Yiming couldn't help but asked: "You really want me to take care of it myself? No, let Lao Hao do it."
Old Hao is the deputy chief engineer arranged by Zhang Xin, Hao Jingtai.
Zhang Wen gave him an idea: "Let Lao Hao take care of their Lao Zhang family's projects. They are all members of the Lao Zhang family and can communicate easily."
Zeng Yiming's eyes sparkled after hearing this: "Hurry up and have someone draw the general plan and balance the earthwork. I'll go talk to Zhang Xin about this."
Now that Huasheng Company no longer has a front desk, Zhang Xin has moved her position to the office since she was promoted to shareholder.
She and Liang Shan were processing the contract he brought back.
Zhang Xin was speechless after hearing this. That's right. Now the company's chief engineer and deputy chief engineer have to personally manage the project.
"I have no objection. I want to be yours, let alone them."
Ahem~ Faced with this sudden driving, Zeng Yiming raised his hands helplessly and surrendered.
"That's it. Go tell him."
Zeng Yiming didn't bother the young man who was drawing the map. He took the geological survey data and looked at it carefully.
The geological conditions of the Guodi Plain in Shudu are relatively simple. They are basically all rooted soil within 2 meters, with gravel underneath.
The geological conditions west of Longquan Mountain are like this and continue to Baopingkou.
Belongs to a small branch of the Longmenshan fault zone.
Fault zones are a tectonic phenomenon on the earth's surface, which are rock fractures and dislocations caused by stress within the earth. In my country, fault zones are widely distributed and have a profound impact on the geological environment and landform characteristics.
The Longmenshan fault zone has a particularly obvious impact on geology. The geology here is complex and contains strata from a variety of rock types and geological periods. The existence of fault zones causes these strata to move with each other, forming a unique landform. Near the fault zone, the geological conditions have changed significantly, which is closely related to the activity of the fault zone.
Baopingkou is a typical example of a fault zone. The geological structure here is unique and affected by fault zones. The activity of the fault zone caused the strata to shift and deform, thus forming the special landform on the side of Baopingkou Mountain. The geological conditions here are very different from other areas, reflecting the huge influence of fault zones on the earth's surface.
The fault zone not only affects the surface geological environment, but also produces significant changes in underground hydrological conditions. The activity of the fault zone will affect the flow and distribution of groundwater, thereby affecting the ecological environment and human activities in the surrounding areas. Near the fault zone, the development and utilization of groundwater resources require special attention to geological safety and environmental protection.
In addition, fault zones are closely related to seismic activity. The stress on the fault zone accumulates to a certain extent, which will lead to the occurrence of earthquakes. Earthquakes not only cause damage to the surface geological environment, but also have a serious impact on human life.
This project uses a slightly denser pebble layer with a foundation burial depth of 2.5~3m. The geological survey recommends a strip foundation.
The groundwater level is between 1.8 and 4m, and can reach 1.6m during wet periods.
Calculating the time, he found that precipitation was really needed. He wrote the precipitation plan in the notebook next to him.
Seeing the strip foundation, he knew in his mind that the height of these resettlement houses should not exceed 7 floors, and they might be brick-concrete structures.
Don't ask why you are so sure. If it is 7 floors and above, either an independent foundation, a raft foundation, or a combination of the two will be used.
He put down the geological survey report and opened the structural diagram to look at it. The design unit did not even provide a structural description, but directly produced a bar-shaped basic diagram. This thing was represented in a flat form with two structural sections.
The reason there are two is that the widths are different.
The two width divisions given on the diagram are 1.5m and 1.2m.
The people at this design institute may have been lazy, and the basic reinforcement has not changed.
Looking at the general layout plan, we can see that there are a total of 36 buildings in the community, including a community activity center and a guard room, with a total of four entrances and exits.
The residences are divided into one-person households to five-person households. The building area of a single household ranges from 35m2 to 145 square meters, with a total construction area of 76,500 square meters. Calculated at 650 yuan per square meter, the construction cost of the community is 46.5 million yuan. Adding the total square meters and some other expenses, the total cost is 46.5 million yuan. At the 50 million yuan mark, it’s a big project.
Zeng Yiming was shocked by the amount and called him a good guy.
He also secretly vowed in his heart that he would take it seriously and not let down everyone's expectations.