Chapter 61 Try to compress the time as much as possible

Style: Romance Author: Wandering in the old cityWords: 2213Update Time: 24/02/20 12:14:19
When Liu Fei saw Xiao Ming for the first time, he was stunned with surprise.

Is this kid with a ring of fluff on his lips their boss?

After a long time, he realized what was happening and sighed, "The waves behind the Yangtze River push the waves ahead!"

Xiao Ming stood up and shook hands with him warmly, and then listened to Luo Yuanchao explain the cause of the matter.

After listening to this, Xiao Ming decided that it was very necessary to explain the construction procedures clearly to Mr. Liu.

When the latter heard this, he waved his hand and said nonchalantly: "These things are not important. The town has already found someone to complete the preliminary preparation work, including three connections and one level. All that is left is to sign a contract with you." ”

After hearing this, Xiao Ming sighed. If this is the case, then sign the contract and start work as soon as possible.

He simply handed the contract to Luo Yuanchao and said with a smile: "Let Mr. Luo do this kind of thing. Mr. Luo, we will arrange for people to come in tomorrow and review the terrain first, and let Mr. Wang make preliminary plans within a week." Let Mr. Liu review the plan design."

Liu Fei agreed with Xiao Ming's positive attitude, but he should start as soon as possible.

"Don't you know the advance payment from Mr. Liu?"

Xiao Ming looked at him expectantly and asked the question that mattered most.

Liu Fei smiled disdainfully and said: "Don't worry, this is the fifth pig farm I have expanded in another place. I know your rules. The 20% advance payment will be credited to your account within a week, but the balance will be paid after the completion of the project." It’s a lump sum payment.”

When Xiao Ming heard this, he was a little dumbfounded. The payment was a bit harsh, but it was acceptable. He could only ask Luo Yuan to urge the project manager to hurry up.

When Liu Fei saw Luo Yuanchao finished signing, he took the initiative to sign it himself, and said solemnly: "Tomorrow you guys come to my head office in Xinchi and complete the seal of our company and that's it."

After he finished speaking, he raised the contract in his hand and reminded: "You guys should stamp it with the official seal first, and I will take a copy back later."

Xiao Ming came to Wang Hui's office, called her to find out the location of the official seal, and found out that it was locked in the password box. After asking for the password, he took the seal out and covered it skillfully.

After completing this work and sending Liu Fei away, Xiao Ming said to Luo Yuanchao: "It seems that we have ignored these large breeding and planting households in the county. You can ask someone to follow them in case they build or expand. What about venue ideas?”

"By the way, how should we deal with the leaky manure board?"

Xiao Ming heard him mention this matter, and it seemed that he still had to find Wang Yuanzheng's structural engineer. They needed to design a hollow prefabricated panel first, and then hand it over to the prefabricated yard for mass production, and finally use it in this project.

Just mention it by the way when Huading Company designs this project.

Xiao Ming went to Wang Yuanzheng's office in person and saw that everyone was equipped with computers and were skillfully using drawing software and calculation software.

There was even an older person who was typing on the keyboard with difficulty using one-finger magic skills. Xiao Ming took a closer look and saw that he was reviewing drawings.

He returned to Wang Yuanzheng's office, where he was reviewing the plan on the computer.

Xiao Ming sat down opposite him alone without disturbing him.

"How long have you been here? Why didn't you call me?" Wang Yuanzheng complained with a smile.

"You are all very busy, and I am embarrassed to disturb you."

Wang Yuanzheng was stunned for a moment and asked: "Tell me, what do you have to explain?"

"You know Liu Fei, the big pig farmer, he just came to entrust us with the design and construction of his new pig farm. But the request was to design and construct at the same time, so I came."

Wang Yuanzheng was in a bit of a dilemma, as this meant that he had to send people to the site again to guide the construction. He tried to gain design time. Nowadays, everyone uses computers to work, and the efficiency is dozens of times that of manual drawing.

"Can you give us a month to design first?"

"The construction period is only half a year, and it also includes your design work. You should try to compress the time as much as possible! In fact, the design is quite simple. After the general layout is completed first, many individual buildings will be the same."

Xiao Ming couldn't bear to rush them, but the owner is God. The time node they proposed must be created if there are no conditions, and if it cannot be completed, it must be gritted and perfected.

"Then I will try to measure the on-site data in five days, complete the general drawing design first, and design the basic part of the individual unit first. I will complete some of the drawings and hand over to you some of the drawings."

There is nothing we can do about this. Construction under the foundation always takes time, which provides conditions for subsequent design work.

"It's possible, and you know that it takes time to make steel pipe columns, roof trusses, purlins, and tie rods, so do it as soon as possible!"

Wang Yuanzheng waved his hand and corrected: "What you just said can be directly handed over to the processing factory to complete. After I come out with the drawings, I will ask Mr. Luo to contact them for production."

Xiao Ming secretly wrote down the steel structure processing factory he mentioned. He knew that the company had a branch.

"Okay, you will contact the project manager selected by Mr. Luo for details later, and we will enter the site together tomorrow."

When the project manager comes in, he must first build temporary facilities at the construction site, including on-site offices, temporary water and electricity, canteens, dormitories, temporary walls, etc.

Don't look at the small amount of content here. It still takes several days to actually build it. The foundation of the prefabricated house needs to be poured with concrete, and the construction of the prefabricated house takes at least one day, right?

Xiao Ming bid farewell to Wang Yuanzheng and came to Luo Yuanchao's office, where he was writing a construction plan for the pig farm.

"In order to save time, you can build the wall while building other temporary facilities. In the first few days, let the masters solve their own food and accommodation problems, such as setting up a canvas tent or something, and then move in after the board house is built. ."

There were two types of temporary housing at this time, one was a bamboo keel exterior or covered with linoleum felt, the other was a simple brick house, and the more sophisticated one was the prefabricated house.

If you use a simple brick house, after the pig farm is built, it is difficult to dispose of the removed bricks, so you can simply use a prefabricated house. There is another advantage of the prefabricated house. After this project is used up, it can be dismantled and stored, and the next project can be continued. Although it is a bit old, it does not affect its use.

"Hope Primary School is almost finished. I plan to use the dismantled board houses there." While talking to Xiao Ming, he skillfully modified the construction plan.

Xiao Ming took a closer look and asked with an expression of disbelief: "You have completed its construction plan so quickly? Have you started to modify it?"

Luo Yuanchao shook his head. He planned to revise the plan himself.

"I plan to write it myself. Why don't I just use the previous one and revise it?"

Xiao Ming's face immediately darkened: "Lao Luo, don't let Hunter Heart have bad tastes. You have a lot to do. Just throw this plan to the technical person in charge of this project."

Luo Yuanchao smiled sheepishly. People with a technical background can't help but be eager to try something they know.

"I asked you to ask your people to contact Mr. Wang and go to the site together tomorrow. You will build temporary facilities and they will do preliminary measurements."