Chapter 16 Point-and-shoot Camera

Style: Romance Author: Wandering in the old cityWords: 2141Update Time: 24/02/20 12:14:19
Zeng Yiming was really tired from writing last night. He had a good night's sleep and it was already 9:30 in the morning when he woke up.

He secretly thought that was bad, why did he oversleep? Fortunately, he had explained today's work before leaving get off work last night.

After a simple wash, I jogged directly to the construction site. The breakfast stalls on the roadside had already been closed. It seemed that I would only be hungry this morning.

Zeng Yiming approached the construction site and saw the cooperation of Lao He and Lao Wang. The wall formwork was half completed.

He came to the edge of the cliff and said briefly to Lao He and Lao Wang who were working at the bottom of the cliff: "It's almost done. Fix the places that need to be fixed and make up for the places that need to be fixed. I'll call you later." I'll check."

After he shouted, he suddenly felt hungry. He simply walked into the office and poured a cup of hot water into the thermos bottle. After drinking it, he felt his body warm and his hunger disappeared without a trace.

He put down the cup and wrote about 500 words of the plan. Lao He opened the door and came in to report: "We have passed the self-inspection. Please go check it out!"

With yesterday's basic experience, there were indeed no major adjustments today. Zeng Yiming just pointed out the location where the water outlet needed to be added and supervised their completion.

Zeng Yiming came to the office and signed a simple "opening order" for concrete pouring to Lao Zhang. After clarifying the pouring quantity, the latter can start today's work.

The task was still quite arduous. Zeng Yiming no longer wanted to guard them foolishly. He returned to the scene and told the three team leaders: "Today, I have given you the task of guarding the scene. I still have to write a plan. Prepare for subsequent completion. Follow yesterday’s pouring method and pour in layers and sections.”

Seeing the seriousness of the three team leaders, Zeng Yiming reiterated the safety issues before leaving the scene.

For the pipe at the weep hole, he asked Lao He to first replace it with a steel pipe. After the concrete had initially set, he would pull out the steel pipe and finally replace it with a plastic pipe.

The PVC plastic pipes are also drawn in the drawings. If they are constructed according to the drawings, there will be no problems.

Just as he was about to leave, Scar arrived, bringing with him a Seagull brand point-and-shoot camera.

When Zeng Yiming saw the camera, his eyes widened. There was nothing he could do about it. Although this thing was film now, it not only had to be protected from exposure, but also had to be taken to a photo studio to develop the film.

The trouble is that it is a little troublesome, but it is really useful. You can't dig out the hidden project after it is hidden. If there is image data left by the camera, it will be different. Photos of different parts can clearly restore the entire construction process.

Zeng Yiming wished he could run up to it, hug the braised egg and kiss it twice.

"This camera will be kept in the office and will be returned to you after the project is completed."

Scar didn't react after hearing this. He finally made an appointment with a girl to go hiking together today. She happened to be nearby. He stopped by to see the progress. Why was it about to be confiscated?

After Zeng Yiming finished speaking, he took the camera from Scar's hand. After finding that the film had been loaded, he ran to the cofferdam and the edge of the cliff, and took fierce shots of the construction site.

Scar reacted and wanted to chase Zeng Yiming, but the kid was too jumpy. As soon as he chased him to the cofferdam, Zeng Yiming ran to the edge of the cliff again.

When Zeng Yiming took photos, he chose angles so that each photo had a slight reference, either a bridge or an obvious nearby building.

After finally using up a roll of film, Zeng Yiming was at his wits end. There was no more film!

Zeng Yiming reluctantly handed the camera back to Scar: "Here, take some time to develop it. It will be useful for archiving in the future. Also, bring a few more rolls of film with you next time you come here."

The corners of Dao Scar's mouth twitched, and he was about to cry without tears. He originally wanted to take a photo with his sister as a souvenir, but this bastard ruined it.

Seeing his aggrieved expression, Zeng Yiming took out a list from his pocket and handed it to Scar with a smile: "Why are you standing still? There are not many materials on the construction site. There is a backup list here. You can ask them according to this." The materials will be delivered at noon.”

Scar bit his back teeth hard and warned himself again and again, for the sake of money, endure it!

He didn't want to see this bastard take away all the good things he had done since meeting him. Now he is directing himself to work!

The more Scar thought about it, the sadder he became. Finally, he simply ignored Zeng Yiming, took the camera and left.

He was sad, but he did not forget the business. He came to the phone booth, took out a 20 yuan IC card, and dialed a familiar number. When the other party answered, Dao Ba was not polite and said quickly: "The construction site by the bridge 600 tons of sand and 900 tons of gravel will be brought over at noon!"

Zeng Yiming only looked at the results. No matter when he contacted her, it was rare to care what he thought.

Everyone’s goal is to make money. If you cooperate well, you will earn more. If you don’t cooperate well, you will earn less. Even if you lose, it doesn’t matter. I haven’t paid any money!

Zeng Yiming continued to write his plan and the construction log. After he only needed to write a template for this thing, he could let Fatty write the rest and faithfully record the daily weather conditions and work content.

He can describe some hidden danger handling methods, safe and civilized construction and site appearance management conditions orally. Fatty only needs to record them completely.

There were also test blocks needed for the experiment. Zeng Yiming originally planned to do it himself, but Lao Zhang volunteered to take over the job, which made Zeng Yiming very grateful.

Concrete test block is a very important experimental basis. Whether the strength of the concrete you use on site meets the standard, the laboratory finally needs to conduct a pressure test according to the samples submitted for inspection. Only when the data meets the standard will a qualified experimental report be issued.

There was also the matter of sending cement, sand and gravel and other materials to the laboratory designated by the water conservancy company for inspection. At the beginning, Zeng Yiming originally planned to let Dao Ba handle it, but in the end, Dao Ba found someone to do this. As I said, there is no need to pay wages.

It’s useless if you don’t use it!

There is no such thing as a free lunch in the world, but you are already paying for it, so why should you be so polite?

The inspection of sand and gravel materials is mainly to test the origin and strength level. The inspection requires the same origin. For every 400 cubic meters or 600 tons of the same specification, 20kg needs to be sent to the laboratory for testing. If the material consumption at a construction site does not meet this standard, then only You only need to send it once.

Cement submission requirements require the same variety, same strength level, and same factory number shipped from the factory at the same time. The total amount does not exceed 200t. The same amount of cement is randomly selected from 30 bags and mixed evenly. Finally, 15kg is weighed and sent to the laboratory. detection.

Zeng Yiming does not use steel bars at this construction site. Let’s not talk about steel bars now. More materials will be used in the future, and new materials are emerging one after another.

There are standard requirements for materials to be submitted for inspection. You just need to follow them. Generally, products from small factories can pass the test.

Of course, if this is a good thing, it is another matter, and it can be operated completely outside the specifications. Once quality problems occur, the construction unit is the first to be held accountable.