Chapter 379: A feast for infrastructure giants

Style: Historical Author: Zhi Tian GeWords: 2085Update Time: 24/01/18 08:07:02
As the weather gradually warms up, new shoots appear on the dark and bare branches that have endured a cold winter and seem to have no life at all.

For Wu Hao and the others, they are not only welcoming the quietly coming spring, there is also good news. That is, the design plan of Haoyu Technology's new Linghu headquarters park has finally passed the review of relevant departments and has been truly finalized.

After many rounds of revisions to the entire design plan, the final plan was finally determined. The entire park covers a total of 2,700 acres, of which the construction area has increased from the original designed 830,000 square meters to 950,000 square meters.

The general design plan of the initial design remains unchanged, but some details have been re-optimized. For example, the height and area of ​​the seven main buildings in the middle have been added as a whole, and the surrounding 28 auxiliary buildings have also been given detailed design plans.

Then there is the planning of the entire park. The project design team also invited experts in this field to participate, which can be said to create a park-like park.

Once the entire design plan was announced, it received special attention from the outside world. Of course, praise and criticism are equally divided. Some praised the park for being beautiful, sci-fi and huge, while others criticized them for being blindly arrogant and seeking pleasure.

For Wu Hao and others, these criticisms have little impact. Their most important task now is to seize the time to identify the final project contractor. For such a huge project, the three-year construction period he established was too short. Therefore, we must ensure that the project starts as soon as possible so as not to delay subsequent follow-up work.

Many domestic and foreign construction industry giants are very interested in their project. A total of hundreds of companies have contacted them directly or indirectly, requesting relevant information and so on.

After subsequent contact and communication and the design plan was basically determined, many interested companies also withdrew one after another, leaving only some relatively powerful companies.

Among them are well-known domestic and international construction contractors. But now everyone in the world knows that our country’s infrastructure capabilities are several positions ahead of other international contractors, and this time this project is located in China. Therefore, although there are international contractors in this bidding project, the main competition is still a few infrastructure giants with national brand names.

After careful screening, a total of seventeen construction contractors entered the final bidding stage.

Being able to enter the bidding process means that these construction contractors themselves have very strong capabilities and have many successful and outstanding construction cases. And the relevant construction plans submitted were approved by Wu Hao and the relevant expert group.

So now these seventeen companies are competing in the bidding meeting, in addition to the overall construction period, the other thing is the quotation.

Among them, there are three companies that everyone is optimistic about, and the most famous among them is probably China Construction. There is no doubt about the strength of this company. As for the construction plans and related planning materials, they are also very complete. Even in order to win this project, China Construction established a team of experts to provide very targeted research solutions on relevant construction plans, construction techniques, construction cycles, and quality assurance.

The construction plan they proposed to complete the overall construction of the seven main buildings of the center in 16 months, complete the construction of all building facilities in the park in 23 months, and complete delivery in 32 months can be said to have been generally accepted by Wu Hao and others. approval.

As for the quotation for the overall project, they initially gave a huge quotation of 11.15 billion. To be honest, this price is still a bit high, but compared to the construction price of the headquarters of other giant companies in the world, it is still relatively cheap.

The second company is also China Railway Construction Corporation, which competes fiercely with China State Construction Engineering Corporation. This construction giant also has a long history, and also has strong strength and brilliant achievements. The company's predecessor came from the Railway Corps Engineering Corps, and it can be said that the tenacity and hard work of soldiers have been passed down and carried forward to this day.

At that time, in order to realize the modernization of the army and the overall goal of disarmament of one million people. After receiving the order, all the officers and soldiers of the Railway Corps Engineering Corps took off their military uniforms without hesitation and devoted themselves to the construction of social infrastructure.

Being forced to change jobs and return to their hometown did not extinguish the fire in their hearts, but instead made it even stronger. In just a few years, the officers and soldiers, no, it should be said that China Railway Construction Corporation stood up with a new look and undertook a series of major projects.

They proposed a construction plan that would take 17 months to complete the overall construction of the center's seven main buildings, 25 months to complete the construction of all building facilities in the park, and 33 months to complete delivery. The total reported amount is 9.75 billion yuan, which is a full billion lower than China State Construction Engineering Corporation.

The third company comes from China State Construction Engineering Corporation Limited. Although this company is not as old as the first two, it is also a domestic and international construction giant.

Its predecessor, China State Construction Engineering Corporation, was established in 1982 and is a key state-owned enterprise. With housing construction contracting, international project contracting, real estate development, infrastructure construction and municipal survey and design as its core businesses, it has developed and grown into a leader in China's construction industry and real estate companies and the largest international contractor.

It is a state-owned enterprise that does not occupy a large amount of funds, resources and patents from the country and has grown up by engaging in a completely competitive industry. It is also the only construction enterprise in China with three special qualifications.

Compared with the first two traditional construction companies, China State Construction Engineering Corporation is younger and more passionate, and has great ideas for many projects, especially major projects. Some innovative construction technologies and construction plans have also reached the international leading level.

But this time, they brought a brand new construction plan. According to their plan, the overall construction of the seven main buildings of the center will be completed in the most extreme period of fourteen months. It will take twenty months to complete the construction of all building facilities in the park, and thirty-two months to complete the overall delivery construction plan. The total reported price is 10.3 billion yuan, which is lower than China State Construction Engineering Corporation Limited and higher than China Railway Construction Corporation Limited.

The construction time of several companies is actually similar, but the construction plan and technology and the order of emphasis are different.

To be honest, Wu Hao and the others couldn't decide which company to choose. Fortunately, major engineering projects like this cannot be determined immediately. And this is just their preliminary plan. Wu Hao and the others still need to communicate and discuss with the bidding teams of these companies and come up with a final bidding plan.