Chapter 1,203 Preparing to build a dam!

Style: Historical Author: Pi Xia KeWords: 2095Update Time: 24/01/12 12:39:31
The mountain is so long that the Bahe River bed is nearly one hundred feet long. How easy is it to cut it off and build a dam? "

In the conference room on the first floor of Guanghua Building in Yanhuang Academy, Mo Zhong looked at a large map on the table, gestured with his hands, and said in a deep voice.

In addition to him, there were also Li Zexuan, Mo Lingwei, Yan Shaoning, and a Mohist named Mo Chui. It was said that he was a disciple that Mo Huai focused on training, and he was very likely to be the next generation of Mohist giants.

Among the people in the Mo family, the one with the highest talent, besides Mo Huai, is Mo Lingwei. However, Mo Lingwei is a daughter, and Mo Huai can't bear that his daughter has to bear too much, so she never Count Mo Lingwei among the candidates for the next tycoon of the Mo family.

Apart from Mo Lingwei, the one with the highest talent is probably Mo Chui. This man is in his mid-twenties and has a family now. He teaches physics at Yanhuang Academy. Before the academy started last semester, all the teachers were tested. In that exam, Mo Chui's score was closely behind Mo Huai's, which shows that his talent is high. However, the Mo family has Mo Huai and Mo Lingwei, a pair of amazingly talented father and daughter, which overshadowed his talent. It's just his light, otherwise he would definitely become a figure in the Mo family!

At this time, everyone in the conference room was staring at a drawing on the table, frowning in thought.

Li Zexuan said in a tone that left no room for doubt: "Nothing is impossible in this world. The Bahe River is only over a hundred feet wide. Building a dam on the river bed is definitely not an impossible task for us! What we need to do now is to find solutions, not to discuss whether it is feasible or not, this dam must be built this year!”

Because of the summer drought and because he wanted to develop Datang's power industry.

Li Zexuan added silently in his heart.

Besides, the river bed width of more than 100 feet is really not very wide for him, that is, more than 300 meters, and the total width of the modern Three Gorges Dam is more than 2,300 meters.

Although modern construction machinery is much more advanced than in ancient times, Li Zexuan feels that a dam of more than 300 meters can be built with a little thought!

Feeling the firmness in Li Zexuan's tone, everyone in the room frowned deeply.

Anyone who is familiar with Li Zexuan knows that as long as it is something he decides, it must be done, and even ten cows can't pull it back!

Now it seems that Li Zexuan is determined to build this dam, so they have no choice but to find ways to complete it!

"But the width of the river bed is so large, and the current of the Bahe River is fast. If you throw stones downward, they will definitely be washed away after a while. How can you cut off the river water and build a dam?"

Mo Huai pondered for a long time and then shook his head and said.

Li Zexuan recalled in his mind the construction process of the famous dam in his previous life. After a while, he pointed at the drawings in front of him, and while making gestures, he slowly said:

"First, we need to build a diversion canal to separate the Bahe River's flow from the middle before we can start the construction of the entire water conservancy project. After cutting off the Bahe River's flow, it will divert the north-south flow, and then build a river channel in the middle. The river channel construction is completed After that, a large amount of stones will be filled on both sides of the river until the stones are enough to cover the water surface. The water in the river on this side will flow to the other side, and then the river on the other side will be built in the same way.

In the early stage, we first used pine wood to strengthen the dam foundation. First, vertical pine wood piles are used to drive piles on the sand and gravel, and they are laid flat or vertically like building a house. Then we build a stone dam. Later, we use cement stone pillars wrapped with steel rods and nail them into the river bed as the backbone of the dam. Root bone, once you have the root bone, the next step is to add stones to it! "

In order to build this dam, Li Zexuan also worked hard. He took out everything he had at the bottom of the box, which was reinforced concrete!

When building dams in ancient times, wooden piles and sand and gravel were generally used as the main body of the dam. However, the Bahe River bed is too wide and the water flow is relatively turbulent. If wooden piles and sand and gravel are used, the embankment will definitely burst over time, so , he can only use stronger reinforced concrete!

Anyway, he now has a mine at home, and the steel production in the workshop is gradually increasing. He is not short of iron for the time being. Moreover, if this dam is built, it will be a huge boost to the industrial base of Lantian County! So no matter how much money he has to invest, Li Zexuan is willing to do it!

"Concrete stone pillars wrapped with steel rods?"

Mo Huai murmured, then suddenly his eyes lit up and he said: "Cement is inherently hard. If steel is mixed into it, after it is formed, it will be extremely tough and be able to withstand the violent impact of the river for many years. It is indeed a good material for building dams! But will the steel consumed in it be too large?"

The rest of the people also turned their attention to Li Zexuan, obviously they had also thought about this issue.

Unexpectedly, Li Zexuan still said firmly: "No matter how big the consumption is, we must build this dam! Even if there is not enough iron ore by then, I will just find another way!"

Mo Huai was speechless. This was the first time he saw Li Zexuan being so persistent about one thing. Of course, this also shows how important this dam is!

"Shan Chief, I wonder if the imperial court will provide support for building the dam this time?"

Yan Shaoning suddenly asked.

Now he is also a teacher at Yanhuang Academy. Within the academy, of course, Li Zexuan cannot be called by his first name. He also wanted to join others in calling Li Zexuan the mountain chief.

Li Zexuan twitched the corner of his mouth and said with a dark face: "The government's finances are currently tight. Although your Majesty is willing to support it, he cannot spare the extra money to support us in building the dam! Everything has to depend on ourselves!"

Yan Shaoning was speechless upon hearing this.

Since the imperial court sent a fleet south for trade last year, the imperial court's financial tension has been greatly alleviated. If others don't know about it, how could he not know about it? So when Li Zexuan said that the government's finances were tight, he understood what he meant. It was because Lao Li was unwilling to pay!

"Ahem! Don't worry about the money. I will solve it! The top priority now is to determine the dam construction plan as soon as possible. Mr. Mo has rich experience, so I think Mr. Mo will be in charge this time. Shaoning, you can take the responsibility How about assistance?"

Li Zexuan coughed dryly and said again.

"I'm OK!"

Yan Shaoning likes challenges most in his life. The construction of Yanhuang Academy last year was the biggest challenge he encountered in his life. Of course, he also handed in a perfect answer sheet. Now this complex dam project makes him eager to try it!

Mo Huai pondered for a moment, nodded, and said: "I will do my best, but in this case, I will have no time to take care of the physics group of the college this semester! I hope the mountain chief can let Mo Chui temporarily take my place. !”

……………………

Reading URL: m.